Facilities: Maintenance & Opportunities

The ChangePoint Facilities team is responsible for the care and upkeep of ChangePoint's Raspberry Campus. Below, you'll find a list of opportunities to volunteer side by side with our team. We look forward to working with you as we care for this awesome resource together.

Concrete Repair - East Entrance

The pictured section of damaged concrete needs repair.

Anticipated time investment: 3-4 hours
Opportunity type: Concrete finishing
Supplies provided: Quick-set concrete patch compound, trowel, drill, concrete drill bits


Concrete Repair - East Stairs

The pictured section of damaged concrete needs repair.  Supplies provided by ChangePoint are described below.

Anticipated time investment: 3-4 hours
Opportunity type: Concrete finishing
Supplies provided: Quick-set concrete patch compound, trowel, drill, concrete drill bits

Mural Restoration - Hangar

The pictured section of  mural requires restoration.  Supplies provided by ChangePoint are described below.

Anticipated time investment: 1-2 hours
Opportunity type: Artistic (visual)
Supplies Provided: Paint, painter's tape, brushes (Additional supplies may be provided upon request)

Mural Restoration - Hall

The pictured section of  mural requires restoration.  Supplies provided by ChangePoint are described below.

Anticipated time investment: 1-2 hours
Opportunity type: Artistic (visual)
Supplies Provided: Paint, painter's tape, brushes (Additional supplies may be provided upon request)

Fence Repair - South Parking Lot

The fence pictured above needs extensive refurbishment. Numerous heavily-aged and/or rotted palings and ties threaten its aesthetic and structural soundness. Damaged palings need to be replaced, and fresh palings need to be painted. Supplies provided by ChangePoint are described below.

Anticipated time investment: Variable
Opportunity type: General labor
Supplies Provided: Drill, driver, screws, fence palings, fence crossbeams, circular saw, sawhorses, paint, paintbrushes, paint rollers, paint roller covers, paint trays, paint tray liners, etc.

Painting - 2nd Floor Hallway

The pictured hallway needs painting.  Supplies provided by ChangePoint are described below.

Anticipated time investment: 2-3 days
Opportunity type: Painting
Supplies Provided: Brushes, paint, rollers, roller covers, trays, tray liners, drop-cloths

Log Sculpture Restoration - AdventureLand Hall

The pictured sculptural section requires restoration.  Supplies provided by ChangePoint are described below.

Anticipated time investment: 1-2 hours
Opportunity type: Artistic (visual)
Supplies Provided: Paint, painter's tape, brushes, sandpaper (Additional supplies may be provided upon request)

Rock Sculpture Restoration - King Cove Hall

The pictured sculptural section requires restoration.  Supplies provided by ChangePoint are described below.

Anticipated time investment: 1-2 hours
Opportunity type: Artistic (visual)
Supplies Provided: Paint, painter's tape, brushes, sandpaper (Additional supplies may be provided upon request)

Seal Statue Restoration - King Cove Hall

The pictured sculptural section requires restoration.  Supplies provided by ChangePoint are described below.

Anticipated time investment: 1-2 hours
Opportunity type: Artistic (visual)
Supplies Provided: Paint, painter's tape, brushes, sandpaper (Additional supplies may be provided upon request)

Bathroom Floor Deep Cleaning - Assorted

Several bathroom floors (as pictured above) need to be deep cleaned.  Supplies provided by ChangePoint are described below.

Anticipated time investment: 3-4 hours per bathroom
Opportunity type: General labor
Supplies Provided: Floor stripping solution, long-handled squeegee, mop and bucket,  faucet adapter and hose

Drywall Repair - Loft

The Loft suffered widespread water damage during the 2018 earthquake. Much of it has been repaired, but numerous damaged sections remain. The pictured sections are the highest priority.

Anticipated time investment: Variable
Opportunity type: Drywall/Painting
Supplies provided: Powered man-lift, ladders, sheetrock saw, sheetrock, drywall screws, drywall tape, 20-minute hot mud, 4-inch and 12-inch taping knives, primer, paint, rollers, and trays.

Volunteer for an Opportunity

See an opportunity you're interested in? Use this form to let us know!